+86-15505345921      rgg@ruidonggroup.com
Home / Projects

Our Project

  • Ruidong Group successfully completed the agricultural industrial park project in Hangzhou, China.

    2023-09-15

    Ruidong Group successfully completed the agricultural industrial park project in Hangzhou, China.Promote ecological agriculture and achieve sustainable development. Ruidong Group successfully completed the agricultural industrial park project in Hangzhou, China. This project uses variable frequency Read More
  • Rooftop Package Unit, in Tellaviv, Israel

    2023-06-05

    Project name: Tel Aviv Black Panther Sports Museum Project address: Tellaviv, Israel Project Overview: This project is located in Tel Aviv, the capital of Israel, with a total construction area of about 500 square meters. Select unit: 140kw Rooftop Package Unit, a total of 2 units. ​Operation status: It has been operating well since October 2021. Read More
  • Module Air Scroll Chiller Unit Of Single Cold in Iran

    2023-06-05

    Project name: Iran IBH Private Bank Headquarters Project address: Iran Tehran Project Overview: This project is located in Tehran, the capital of Iran, with a total construction area of about 20,000 square meters. There are 2 service halls and 20 office partitions. Select unit: single -cold air -cooled module unit RLSFWM068B, a total of 8 units ​Operation status: It has been operating well since October 2021. Read More
  • Horizontal concealed Fan Coil Unit in Iraq

    2023-06-05

    Project Name: Iraq Titanic Five -Star Hotel Project Address: Iraqibarda Project Overview: This project is located in Baghdad, the capital of Iraq, with a total construction area of 130036㎡, with a total of 200 standard rooms, restaurants and pools. Selected units: Horizontal concealed Fan Coil Unit, FP068WA and FP102WA, 28 units in total Operation status: It has been operating well since September 2021 Read More
  • Air Cooled Screw Chiller and Heat Pump in Qatar

    2023-06-05

    Project Name: Khalifa International Stadium Project address: Qatar Project Overview: Khalifa International Stadium was built in 1976. It is one of the oldest stadiums in Qatar and the home stadium of the Qatar National Team. The stadium has been refurbished, rebuilt and expanded specifically for this World Cup. After the expansion, the number of seats in the stadium increased by 12,000. Khalifa International Stadium adopts a huge curved structure. The most important change after the renovation is the addition of a huge new roof, which is also equipped with an advanced cooling system to provide comfortable conditions for the game. After the World Cup, it will become the Qatar National Stadium. ​Selected unit: air-cooled screw chiller, cooling capacity is 560kw, 800kw and 1000kw, air-cooled scroll chiller is 20kw Read More
  • Mushroom greenhouse project in Seoul, Korea

    2023-06-05

    Project name:Greenhouse Project of Plant Breeding Base in Seoul, South Korea Project address:Seoul, South Korea Project overview:The breeding base shares 20 greenhouses, each with an area of 300-400 square meters, and a total construction area of 10,000 square kilometers. Selected units:Air-cooled breeding air conditioners, 20 units Read More
  • Water Cooled Screw Chiller For Beijing Scientific Research Center

    2023-05-31

    ​Project Name: Ventilation and Air Conditioning Project of Beijing Langtiangang Shunyi Research Center Project Address: Courtyard No. 10, Airport, Shunyi District, Beijing Project overview: This project constructs a scientific research center building with three floors underground and nine floors above ground, with a building height of 45 meters. The total construction area of the project is 44812.3 square meters, of which the above-ground construction area is 26666.6 square meters, and the underground construction area is 18145.7 square meters. This project adopts the fan coil unit plus fresh air system, the air conditioning refrigerant is 7~12°C chilled water, the cold source is provided by the chiller, and the chiller is located on the roof of the building. Contract amount: 46 million yuan Selected units: Water Cooled Screw Chiller and Heat Pump, Cooling tower Read More
  • Air handling units in Xi'an Province, China

    2023-05-31

    Project Name: Xi'an Airport International Convention and Exhibition Center Project address: No. 15 Guangren West Road, Airport New City, Xixian New District, Xianyang City, Shaanxi Province Project overview: The planned land area of the project is about 103,200 square meters, and the total building area is 77,500 square meters, including 56,900 square meters above ground and 20,600 square meters underground. The convention and exhibition center has 3 exhibition halls, 2 log-in halls, a multi-functional hall that can accommodate more than 3,000 people, and multiple conference rooms that can be divided and combined, with a space floor of up to 12 meters. Selected units: Air handling units, 34 units; Heat recovery air handling units, 2 units. ​Operation status: It has been running well since it was opened in November 2021 Read More
  • Air Cooled Screw Chiller For Sinopec Shengli Oilfield

    2023-05-31

    Project name: Sinopec Shengli Oilfield, Guangrao County, Gezhuang Town Oilfield Oil Storage Heating Air Conditioning Project Project Address: Daozhuang Town, Guangrao County, Dongying City, Shandong Province Project Overview: This project is the main function of the oilfield oil storage pipeline. Select unit: Air Cooled Screw Chiller, LSGF400ARM four units ​Operation: It has been operating well since November 21st Read More
  • Total 2 pages  Go to Page
  • Go

Whatsapp:

+86-13626409993

Email us:

Call us on:

+86-15505345921
Integrating design, production, sales and installation of central air-conditioning products.

Aqua-Therm Moscow 2024
Aquatherm_logo_151
Location:Crocus Expo International Exhibition Center Moscow (Russia)
Date: 06-09 Feb., 2024'
Booth: Pavilion 3-14,C215
 
INSTALACJE Poland 2024
波兰展会
Location: ul. Głogowska 14, skr. poczt.102, 60-734 Poznań, Polska/Poland
Exhibition hall name: Poznań International Fair Ltd.
Date: April 23-25, 2024
Booth: Hall 5, No. 127
 
Bangkok RHVAC 2024
Placeholder ImageLocation: Bangkok InternationalTrade and Exhibition Center
Date: 07-10 Sep., 2024
Booth: EH103-104,BITEC
 

Useful Links

Projects

Send Us

Send Us
​Copyright 2023 Ruidong Group Co., Ltd  Sitemap. Support by:Leadong.  鲁ICP备14020406号-32